Skip to main content
European Commission logo
SFC Support Portal
System for Fund Management in the European Union
Published by joffrso on 23 April 2014

RDP - 8. Measures selected - Is it necessary to complete the “Verifiability and controllability of the measures and operations” in sfc2014?

Structure for Verifiability and controllability (ex-8.2.d), methodology for calculation of amount of support (ex-8.2.e) and measure specific information (ex-8.2.f) is repeated at the measure and type of operation level. Member State has the full flexibility to decide which level is appropriate. Those sections must be filled in either at the measure level or type of operation level or both levels.

For measures 10-11-12-14-15 the methodology for calculation of amount of support (ex-8.2.e) is to be replaced by the measure specific information, where we describe in more details what is exactly required for those measures.