    PURPOSE

    This document describes the specifications of the Implementation Report (IR) procedure as described in Article 54 of Regulation (EU) No 514/2014 of the European Parliament and of the Council of 16 April 2014 and more specific those related to the Implementation Reports for ISF.

    The deadline for submission of the Implementation Reports is 31st March starting from 2016, which will contain the financial years 2014 and 2015, and ending in 2022. For the Final Implementation Report, the deadline for submission is 31st December 2023.

     

    REGULATION

    More details about the regulation regarding the Implementation Report (ISF) can be found in 'About SFC2014' section of this portal.

     

    ROLES

    Roles involved in the Implementation Report (AMIF, ISF) are:

    MS Responsible  Authority

    Record the Implementation Report

    Upload the Implementation Report

    Consult the Implementation Report

    Delete the Implementation Report

    Validate the Implementation Report

    Send the Implementation Report

    Return the Implementation Report

    Cancel the Implementation Report

    Create New Version of an Implementation Report

    MS Audit Authority

    Consult the Implementation Report

     

    FUNDS

    ISF

     

     

     

     

    PRE-CONDITIONS:

    The National Operational Programme is Adopted by the Commission and managed on your Node.

    When creating, the Implementation Report for a specific Reporting Year doesn't yet exist.

     

    Workflow

    This section shows the lifecycle to create and manage an Implementation Report (ISF).

    If the Commission rejects an IR  ISF, the programme is returned and a new version has to be created and go through the whole process. The Commission cannot change an IR – only respond.

     

    Click here to see the IR ISF state diagram in high resolution.

     

     

    Create the Implementation Report (ISF)

     

    REMARK

    To create the Implementation Report (ISF) you must have MS Responsible Authority with Update access.

    A National Programme must have been Adopted by the Commission in order for you to create an Implementation Report.

    In tables with achievement year columns, only the years equal and before the Reporting Year will be shown.

     

    1.       To access into the Implementation Report (AMIF, ISF) section, first click on the Monitoring link (1) in the menu and then on the Implementation Report (AMIF, ISF) link (2).

     

     

    2.       Click on the Create new Implementation Report link to create a new Implementation Report (ISF).

     

     

    You are redirected to the Implementation Report (ISF) creation page:

     

     

    3.       Enter or Select the following information:

    (1) Select a CCI.

    The CCI list contains all adopted AMIF and ISF Programmes managed at your Node and which contain a Fund for which you are registered. The list returns the CCI and the Programme Title.

    (2) Select a Reporting Year.

    The Reporting Year list contains all years smaller than the current year, starting from 2015, for which no Implementation Report exists. The last Implementation Report will be for 2022. From 2023 onwards, the list will also contain 'Final'.

    (3) Click on the Finish button to confirm the creation.

     

    The status of the Implementation Report is Open.

     

    REMARK

    The Implementation Report is linked to the last adopted version of the National Programme, even when it was adopted after the reporting year.

    The records of the following Tables will automatically be created from the equivalent tables in the linked National Programme Version:

    • Section 3 on Specific Objectives, National Objectives and Specific Actions,
    • Indicators Table complemented with the AIR Common Indicators (AMF/ISF).
    • Section 8 on commitments per Specific Objective.

    The annual achievement values for previous Reporting Years are copied from the Implementation Report of the previous Reporting Year.

    The Timetable will first be populated with timetable records with an action name from the linked National Programme version. Then, when the previous year’s AIR was submitted after the submission of the linked National Programme version, the start years of the different phases in the current AIR will be updated with that previous year’s AIR data.

     

    Record/Edit the Implementation Report (ISF)

     

    Find all the information to complete each screen of the Implementation Report (ISF), below there are the links to the main sections:

    -          General

    -          S3 Programme Objectives

    -          S4 Special case: Special Transit

    -          S5 Indicators

    -          S6 Framework

    -          S7 Financing Plan

    -          S8 Commitments by form of agreement

     

    General

    Version Information

     

    The Version Information contains information on the identification and status of the Implementation Report version; like the CCI, the Title, the Version Number, the Status, the Work Version number, the Current Node, etc.

    You cannot edit the Version Information screen for the AIR (ISF).

     

     

    Officials in Charge

     

    Note

    Officials in Charge can be updated at any time, independent from the status of the Implementation Report.

     

     

    ·         Click on the Add button 10-12-2013 11-12-11 to add a new Official in Charge.

    ·         Select an official and click in the Edit button 10-12-2013 10-54-13 to modify the information of this Official.

    ·         Select an official and click on the Remove button 10-12-2013 11-12-37 to delete the Official in Charge selected.

     

    1.       Click on the Add button 10-12-2013 11-12-11 to add a new Official in Charge

     

     

    The Edit Details pop-up window appears:

     

    Wor36E9

     

    2.       Enter the following information:

    (1) Enter the Name.

    (2) Enter the Email.

    (3) Click on Update to save the information.

     

    Note

    Commission Officials (email domain "ec.europa.eu") can only be created/updated/deleted by Commission Users.

     

    History

     

    This section shows all the actions that happened in the Implementation Report since it was created, for example:

     

    WorC002

     

    Documents

     

    The Documents list shows all documents uploaded against this version of the Implementation Report by the Member State and by the Commission.

     

    The following document types will be foreseen:

     

    Description

    Non-integral

    Integral

    System

    Required

    Other Member State Document

    X

     

     

     

    Snapshot of data before send

     

    X

    X

    X

    Acknowledgment of Receipt

     

     

    X

    X

    Indicators Explanation

     

    X

     

     

    Information and Publicity

     

    X

     

    X

     

    Uploading & Sending Documents

     

    Multiple documents can be uploaded in the Implementation Report.

     

     

    ·         Clicking on the Add button 10-12-2013 11-12-11 will open a pop up window allowing you to add a new document type with attachments.

    ·         Selecting a document row and click in the Edit button10-12-2013 10-54-13will allow you to modify the document information. If a document of type 'Other Member State Document' must be sent, you can select the edit button in order to send the document.

    ·         Selecting a row of a previously uploaded document and click on the Remove button 10-12-2013 11-12-37 to delete the document and associated attachments.

     

    1.       Click on the Add button 10-12-2013 11-12-11 to add a new document.

     

     

    The document detail pop-up window appears:

     

     

    2.       Enter or select the following information:

    (1) Select a Document Type

    (2) Enter a title for your Document

    (3) Enter a Document Date

    (4) Click on the Add button 10-12-2013 11-12-11 to add a new attachment

    ·         You can add multiple attachments by clicking on the Add button 10-12-2013 11-12-11

    ·         You can remove unwanted attachments by selecting the attachment and clicking on the Remove button 10-12-2013 11-12-37

    (5) Enter a Title for your attachment.

    (6) Select the Language of the document.

    (7) Select the file to upload.

    (8) Click on Update to save the information or Update & Send to send the document to the Commission.

     

    The pop-up window closes and the documents are uploaded.

     

    REMARK

    Commission Registration N° is only enabled for Commission Users, while Local Reference is only enabled for Member State Users.

     

    To send a non-integral document

     

    1.       Once the document and attachment(s) have been uploaded select the document row in the list (1) and click on the Edit button10-12-2013 10-54-13(2):

     

     

    2.       Click on Update & Send to send the document to the Commission.

     

     

    Remark

    The Update & Send option is only shown for documents which are not an integral part of the Implementation Report.

    If more than one file are uploaded from the same document table, when clicking the Update & Send link, will send all the files and not only the one(s) for which the check-box has been ticked.

     

    Remark

    Non-integral documents (ie. 'Other Member State Document') can be sent at any time independently of the status of the AIR AMIF/ISF.

    The 'Other Member State Document' type demands a manual submission (they are NOT sent automatically within the Programme). The other document types, integral documents, are automatically sent - together with the encoded data – when the Programme is submitted to the EC.

    You can find in our Portal the types of documents that can be uploaded and sent by the Member State, 'OP Documents'.

    A document is only visible to the Commission when the Sent Date is visible.

     

    Deletion of an unsent document

     

    1.       Select a row (1) of a previously uploaded document and click on the Remove button 10-12-2013 11-12-37 (2) to delete the document and associated attachments.

     

     

    A confirmation window appears:

     

     

    2.       Click on Yes to confirm deletion. Click on No to return to the Implementation Report documents.

     

    Hiding a sent document

     

    Note

    Sent Documents can never be deleted, but the sender can decide to hide the content for the receivers in case of an erroneous and/or accidental send.

     

    1.       Select a row (1) of a previously sent document and click on the Edit button 10-12-2013 10-54-13(2) to hide the document and associated attachments.

     

     

    2.       Select the Hide Content option (1) and click on the Update link (2) to hide the Implementation Report document.

     

     

    Observations

     

    This section is to provide any relevant information to the Implementation Report.

     

    3.       Enter the following information:

    (1) Enter an observation.

    All users who have Read and Observation permission on the Implementation Report will be able to send an Observation and participate in the conversation.

    (2) Click on the Add to save the information.

    All Observations are kept against the specific version of the Implementation Report.

     

    S3 Programme Objectives

    Section 3: Programme Objectives

     

    SO1 Visa Policy

     

    Specific Objective 1: Support a common visa policy / ISF-B Article3(2)(a)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to add a summary of the progress made in implementing the strategy.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 3000

    (2) Click on the Update link to save the information.

     

    National Objectives

     

    Note

    The same Edit Details screen will be appear for all National Objectives covered by the Programme.

     

    1. National Capacity – VISA

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    2. Union Acquis – VISA

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    3. Consular Cooperation

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    Specific Actions

     

    1. Consular Cooperation

     

    Specific Action 1: Consular Cooperation / ISF-B Annex II

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions supported and carried out over the financial year.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    SO2 Borders

     

    Specific Objective 2: Borders

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to add a summary of the progress made in implementing the strategy and achieving the national objectives.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 3000

    (2) Click on the Update link to save the information.

     

    National Objectives

     

    1. Eurosur

     

    Actions funded under national objective 1: EUROSUR / ISF-B Article 9(2)(a)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    2. Information Exchange

     

    Actions funded under national objective 2: Information exchange / ISF-B Article 9(2)(d)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    3. Common Union Standards

     

    Actions funded under national objective 3: Common Union Standards / ISF-B Article 9(2)(e)(f)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    4. Union Acquis – Borders

     

    Actions funded under national objective 4: Border Union Acquis / ISF-B Article 9(2)(g)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    5. Future challenges

     

    Actions funded under national objective 5: Future challenges / ISF-B Article 9(2)(h)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    6. National capacity – Borders

     

    Actions funded under national objective 6: Borders - National capacity / ISF-B Article 9(2)(b)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    Specific Actions

     

    2. Frontex Equipment

     

    Specific Action 1: FRONTEX Equipment / ISF-B Annex II

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the equipment purchased over the year.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    SO3 Operating Support

     

    Specific objective 3: Operating Support / ISF-B Article 10

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to enter a summary of the progress made in implementing operating support.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 3000

    (2) Click on the Update link to save the information.

     

    National Objectives

    VISA

     

    Actions funded under national objective 1: Operation support for VISA

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    Borders

     

    Actions funded under national objective 2: Operating Support for Borders

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    SO5 Preventing and combating crime

     

    Specific objective 5: Preventing and combating crime /ISF-P Article 3(2)(a)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to enter a summary of the progress made in implementing the strategy.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 3000

    (2) Click on the Update link to save the information.

     

    National Objectives

     

    1C – Prevention & combating crime

     

    Actions funded under national objective 1: C - prevention and combating / ISF-P Article 3(3)(a)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    2C – Exchange of information

     

    Actions funded under national objective 2: C - exchange of information / ISF- P Article 3(3)(b)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    3C – Training

     

    Actions funded under national objective 3: C - training / ISF-P Article 3(3)(c)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    4C – Victim Support

     

    Actions funded under national objective 4: C - Victim Support / ISF-P Article 3(3)(d)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    5C – Threat & Risk Assessment

     

    Actions funded under national objective 5: C - threat and risk assessment / ISF-P Article 3(3)(g)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    SO6 Risks & Crisis

     

    Specific objective 6: Risk and crisis / ISF-P Article 3(2)(b)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to enter a summary of the progress made in the implementing the strategy.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 3000

    (2) Click on the Update link to save the information.

     

    National Objectives

     

    1R – Prevention & Combating

     

    Actions funded under national objective 1: R - Prevention and Combating / ISF-P Article 3(3)(a)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    2R – Exchange of information

     

    Actions funded under national objective 2: R - Exchange of information / ISF-P Article 3(3)(b)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    3R – Training

     

    Actions funded under national objective 3: R - Training / ISF-P Article 3(3)(c)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    4R – Victim Support

     

    Actions funded under national objective 4: R - Victim support / ISF-P Article 3(3)(d)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    5R – Infrastructure

     

    Actions funded under national objective 5: R - Infrastructure / ISF-P Article 3(3)(e)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    6R – Early Warning & Crisis

     

    Actions funded under national objective 6: R – Early warning and crisis / ISF-P Article 3(3)(f)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    7R – Threat & Risk Assessment

     

    Actions funded under national objective 7: Threat and risk assessment / ISF-P Article 3(3)(g)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    Indicative Timetable

     

    Planning the 3 main actions for each national objective and specific action.

     

    Remark

    The Timetable will first be populated with timetable records with an action name from the linked National Programme version. Then, when the previous year’s AIR was submitted after the submission of the linked National Programme version, the start years of the different phases in the current AIR will be updated with that previous year’s AIR data.

    Only the 'Start of…' Years can be updated.

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to update the 'Start of…' Years.

     

     

    The table becomes editable:

     

     

    2.       Enter the following information:

    (1) Enter the Start of Planning Phase

    (2) Enter the Start of Implementation Phase

    (3) Enter the Start of Closing Phase

    (4) Click on the Update link to save the information.

     

    S4 Special Case: Special Transit

     

    Special case: Operating Support for the Special Transit Scheme for LT

     

    Remark

    Special Transit Scheme is only for ISF Lithuania.

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide an overview of the implementation of the Special Transit Scheme in the financial year.

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 3000

    (2) Click on the Update link to save the information.

     

    3.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to list the main actions supported and carried out over the financial year.

     

    The Edit Details pop-up window appears:

     

     

    4.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2500

    (2) Click on the Update link to save the information.

     

    S5 Indicators

     

    Common Indicators and Programme Specific Indicators

     

    Explanation

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide an explanation of any indication.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 1000

    (2) Click on the Update link to save the information.

     

    Values

     

    Remark

    The Indicator records are copied from the last adopted Programme version at creation time. They are complemented with the AIR Common Indicators.

    Only the annual achievement values can be updated.

    In tables with achievement year columns, only the years equal and before the Reporting Year will be shown.

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to enter the values.

     

     

    The table becomes editable:

     

     

    2.       Enter the following information:

    (1) Enter the annual achievement value.

    Only the years equal and before the Reporting Year will be shown.

    (2) Click on the Update link to save the information.

     

    S6 Framework

     

    Framework for Preparation and Implementation of the Programme by the Member State.

     

    6.1 Monitoring Committee

     

    Monitoring Committee (Article 12(4) of Regulation (EU) No 514/2014)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide a list of the main decisions taken and issues pending before the Monitoring Committee.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2800

    (2) Click on the Update link to save the information.

     

    6.2 Monitoring & Evaluation

     

    Common monitoring and evaluation framework (Article 14(2)(f) of Regulation (EU) No 514/2014)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide the measures taken by the Responsible Authority.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 4000

    (2) Click on the Update link to save the information.

     

    6.3 Partnership Involvement

     

    Partnership involvement in the implementation, monitoring and evaluation of the national programme (Article 12(3) of Regulation (EU) No 514/2014)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide a brief description given by partners

     

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2800

    (2) Click on the Update link to save the information.

     

    6.4 Information & Publicity

     

    Information and publicity (Article 48 of Regulation (EU) No 514/2014)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide a link to the web site of the programme.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 2800

    (2) Click on the Update link to save the information.

     

    6.5 Complementarity

     

    Complementarity with other Union instruments (Article 14(2)(e) and 14(5)(f) of Regulation (EU) No 514/2014)

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide a description with the main actions that were carried out to ensure coordination with other Union instruments.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 3000

    (2) Click on the Update link to save the information.

     

    6.6 Direct Award

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide a justification for each occasion when direct award was carried out.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 3000

    (2) Click on the Update link to save the information.

     

    S7 Financing Plan

     

    THE FINANCIAL REPORT (ARTICLE 54(2)(A) OF REGULATION (EU) NO 514/2014)

     

    Table 1 ISF – Borders

     

    ISF-Borders financial summary as declared in Accounts

     

    Remark

    This is not a copy, but a real time view on the corresponding data from the last available Accounts version for the same Year as the Implementation Report sent to the Commission. This means this view can change even after submission of the Implementation Report to the Commission.

     

     

    Table 2 ISF – Police

     

    ISF-Police financial summary as declared in Accounts

     

    Remark

    This is not a copy, but a real time view on the corresponding data from the last available Accounts version for the same Year as the Implementation Report sent to the Commission. This means this view can change even after submission of the Implementation Report to the Commission.

     

     

     

    Table 3 Implementation of the Financing Plan

     

    Implementation of the Financing Plan of the National Programme specifying the total EU contribution for each financial year

     

    Remark

    This is not a copy, but a real time view on the corresponding data from the last available Accounts version for the same Year as the Implementation Report sent to the Commission (= Implemented) and on the corresponding data from the last adopted Programme version at the creation of this Implementation Report (= Programmed). This means this view can change even after submission of the Implementation Report to the Commission.

     

    Minimum Threshold Derogation

     

    Justification for any deviation from the minimum shares set in the Specific Regulations

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to provide a justification if the situation it is not the same as in the approved national programme.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 1300

    (2) Click on the Update link to save the information.

     

    S8 Commitments by form of agreement

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to enter the amounts committed up to date of this report.

     

     

    The Table becomes editable:

     

     

    2.       Enter the following information:

    (1) Enter the total amount committed up to the date of this report.

    (2) Click on the Update link to save the information.

     

    S9 Covid19 expenditure

     

    1.       Clicking on the Edit button 10-12-2013 10-54-13 will open a pop-up window allowing you to enter the text for sub-section I. Explanation.

     

     

    The Edit Details pop-up window appears:

     

     

    2.       Enter the following information:

    (1) Enter a description text.

    Max. Length 1300

    (2) Click on the Update link to save the information.

     

    3.       Clicking on the Edit button 10-12-2013 10-54-13 of the sub-section II. COVID19 expenditure (EU Contribution) will allow you to enter the amounts

     

     

    The table becomes editable:

     

     

    4.       Enter the following information:

    (1) Enter only amounts linked to projects included in the accounts.

    (2) Click on the Update link to save the information.

     

    Validate the Implementation Report (ISF)

     

    REMARK

    The Implementation Report can be validated when it is in a status 'Open' and currently resides at your Node.

    It is a must to have the role of MS Responsible Authority Update.

     

    1.       Click on the Validate link to validate the Implementation Report (ISF).

     

     

    The system validates the following information:

     

    REMARK

    An Error will block you from sending the AIR (ISF). The error(s) should be resolved and the AIR must be revalidated. Note that a Warning does not block you from sending the Implementation Report.

     

    CODE

    VALIDATION RULES

    SEVERITY

    2

    The system validates the integrity of the input fields

     

    2.1

    Validate that at least one Official in Charge of the Member State exists

    Warning

    2.2

    Validate that the CCI code matches the following regular expression (implicit in web):

    • (……65….…)

    Error

    2.3

    Validate that the linked Programme version is the last available.

    Warning

    2.4

    Validate that the Specific Objective records are equivalent (not less, not more) to the records in the linked National Programme Version.

    Error

    2.5

    Validate that the National Objective records are equivalent (not less, not more) to the records in the linked National Programme Version.

    Error

    2.6

    Validate that the Specific Action records are equivalent (not less, not more) to the records in the linked National Programme Version.

    Error

     

    2.7

    Validate that the Timetable records are equivalent (not less, not more) to the records with an Action Name in the linked National Programme Version.

    Error

    2.8

    Validate that the Indicator records of type AMFISF are equivalent (not less, not more) to the records in the linked National Programme Version.

    Error

    2.9

    Validate that the all AIR Common Indicators (AMFISFD) have been added under each occurrence of their master Common Indicator (AMFISF).

    Error

    2.10

    Validate that all integral documents have at least one attachment with a length > 0

    Error

    2.11

    Validate that the Timetable the Start <= Implementation <= Closing year and that their values are between 2014 and 2023. This implicitly means that all 3 fields are mandatory.

    Error

    2.12

    Validate that in section 8 there is a commitment amount on all records.

    Error

     

    After all errors have been resolved the status of the Implementation Report becomes Ready to send.

     

    An example of a validation window:

     

     

    Send the Implementation Report (ISF)

     

    REMARK

    It is a must to have the role of MS Responsible Authority with Send rights.

    The Implementation Report (ISF) can only be sent once all Validation Errors have been removed and the status of the Implementation Report is Validated.

    The Implementation Report version has a status 'Ready to send' or 'Sent'.

    For users, the '4 eye principle' must be respected. Therefore, the user sending must be different from the user who last validated.

    The Sending of information by a Member State to the Commission should be electronically signed in accordance with Directive 1999/93/EC. Sending of the different objects is generating a snapshot document and after the sending an acknowledge document is generated by the European Commission.

     

    1.       Click on the Send link to send the Implementation Report (IGJ).

     

     

    The system will ask you to confirm the send action:

     

     

    2.       Click on Yes to confirm or click on No to return to the Implementation Report (ISF).

    3.       The Sending of information by a Member State to the Commission should be electronically signed in accordance with Directive 1999/93/EC.

    Sending of the different objects is generating a snapshot document and after the sending an acknowledge document is generated by the European Commission.

    This acknowledge document is signed but the Member State was not signing the snapshot document. The EU Login now provides a functionality of signing without forcing the user to have a certificate. The action to sign will only be triggered when sending to the European Commission:

     

    https://ec.europa.eu/sfc/sites/default/files/Signing%202.png

     

    (1) Enter your SFC2014 Password

    (2) Click on the 'Sign' button

     

    On success, the Implementation Report version has been sent to the Commission or to an upper node and the status is set to Sent.

     

    Delete the Implementation Report (ISF)

     

    REMARK

    The Implementation Report for ISF cannot be completely deleted anymore, so the permissions on the delete action were removed and the link ‘Delete’ will not appear among your options.

    In case you need to delete the whole IR, you will have to ask your Desk-Officer who will analyse case by case and if they confirm, we will temporarily grant the delete action to you.

    An Implementation Report (ISF) can be deleted only if its status is 'Open', 'Ready to send' or 'Returned for modification by MS' and has never been sent to the Commission before and has no sent documents attached.

    It is a must to have the role of MS Responsible Authority with Update access.

     

    1.       Click on the Delete link to remove the Implementation Report from the system.

     

     

    The system will ask you to confirm the delete action:

     

     

    2.       Click on Yes to confirm or click on No to return to the Implementation Report (ISF).

     

    On success, the Implementation Report is removed physically from the system.

     

    Create a New Version of the Implementation Report (ISF)

     

    REMARK

    It is a must to have the role of MS Responsible Authority with Update access.

    A New Version can only be created when the last Implementation Report version for the specific Reporting Year is in status 'Returned for modification by EC' or 'Non-Admissible'.

     

    1.       Click on the Create New Version link to create a new version of the Implementation Report (ISF).

     

     

    The system will ask you to confirm the creation of a new version:

     

     

    2.       Click on Yes to confirm or on No to return to the Implementation Report.

     

    On success, a new version of the Implementation Report (ISF) has been created as a copy of the previous version, with a version number identical to the previous and a working version incremented by one. Its status was set to Open.

     

    Additional Functionality

     

    Early warning notification

    An early warning notification job will run every year starting from 2016 on 1, 15, 20, 26, 27, 28, 29, 30 and 31 of March. It will select all adopted AMIF and ISF Programmes for which no Implementation Report for Reporting Years smaller than the current year and bigger than 2014 have been sent to the Commission.

    For these Programmes, an email notification will be sent to the MS Officials in Charge of the Programme and to the subscribers of this Event Type. The notification will say:

    "The Implementation Report [YYYY] for Programme [CCI] has not yet been sent to the Commission. Please submit it as soon as possible."