New Release 15/12/2014 SFC2014 FrontOffice 1.3.14
1.OP EMFF: Modification in validation rule 2.24 for Union Priority 3 - new precision
2.24 validate the EMFF co-financing rate in the Financing Plan by Union Priority and Union Priority Measure used in the Programme (8.2)(error). In order to determine it is used check if a SpecificObjectiveMeasure is used in section 3.3 and then relate to UnionPriorityMeasureEmff and UnionPriorityEmff. Union Priority 3 Measures 2 and 3 are a special case since they relate to the same SpecificObjectiveMeasure in section 3.3 and they are not obliged to use them both in 8.2. So, for them the validation result is only a warning:
- Union Priority 3, Measure 1: between 79.999% and 80% (error)
- Union Priority 3, Measure 2: between 89.999% and 90% (warning)
- Union Priority 3, Measure 3: between 69.999% and 70% (warning)
For ESF matching support in Table 18b, the maximum allowed co-financing rate is the maximum rate over all Categories of regions covered by the Priority Axis. This is different with the maximum allowed co-financing rate check on non-YEI records from Table 18a, where it is always determined within the Category of Region of the T18a record. Therefore it is best to split the validation rule in two, one for T18a checking and one for T18b checking.
2.OP IGJ: Changes in validation rule 2.67. Split between rule 2.67 for non-YEI records in Table 18a and rule 2.68 for non-YEI records in Table 18b
2.67 validate that the co-financing rate of each non-YEI ProgrammePriorityPlan record in Table 18a doesn't exceed the maximum allowed co-financing rate
2.68 validate that the co-financing rate of each non-YEI YeiPriorityPlan record in Table 18b doesn't exceed the maximum allowed co-financing rate
3.OP IGJ/ETC: Validation rule 2.66 should only be applied on public expenditure and for ETC only on ERDF records.
Validation rule 2.66 is modified:
for IGJ:
validate that the (Union Support (A) / (Union Support (A) + National Public Funding (C))) * 100 of each ProgrammePriorityPlan record in Table 18a is minimum 20% (Art. 120(6) of Reg. 1303/2013 says that “the contribution from the funds for each priority axis shall not be less than 20% of the eligible public expenditure”)
for ETC:
validate that the (Union Support (A) / (Union Support (A) + National Public Funding (C))) * 100 of each ERDF ProgrammePriorityPlan record in Table 16 is minimum 20% (Art. 120(6) of Reg. 1303/2013 says that “the contribution from the funds for each priority axis shall not be less than 20% of the eligible public expenditure”)
Validation message should be "The Union Support in Table 18a for Priority Axis "{0}", fund "{1}" and region category "{2}" should be minimum 20% of the eligible public expenditure: {3}%.